Work-Station (m)

Tasks assigned for each workstation

Station Time (min.)

Idle Time (min.)

1

1,2,3,4,5,6,7,8,9,10

87.88

64.45

2

11,12,13

77.89

74.44

3

14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29, 30,31,32,33,34,35,36,37,38

73.32

79.01

4

39,40,41,42

112.90

39.43

5

43,44,45,46,47,48,49,50,51, 52,53,54,55,56, 57,58,59,60, 61,62,63

107.64

44.69

The total idle time (Tid) = 303.02 min., The workload variance (wv) = 249.28, The line efficiency (E) = 81.42%.